Market pricesUAEInstalled works rates
Installed works rates prices in UAE today
Market prices for Installed works rates in UAE (Dubai): one price per item, with its specification, unit, VAT and check date.
- Market day
- 1 November 2026
- Items
- 52
- Prices for
- Dubai
- Currency
- UAE dirham
All items
Installed works rates
Machine excavation in normal soil
Bulk or trench excavation by machine in sand or normal soil to about 3 m deep, trimming and stockpiling on site; Dubai subcontract rate per m³, labour and plant
26.50
Estimate, not yet confirmed
AED / m³
VAT not statedSupply and installChecked 28 October 2026Ask QuantaBlockwork 200 mm, supply and build
200 mm hollow concrete blockwork in cement mortar, blocks, mortar and joint reinforcement included; Dubai subcontract rate per m², supply and build
91
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 29 October 2026Ask QuantaInternal cement plaster
Internal cement–sand plaster 15–20 mm in two coats, mesh at joints and corner beads included; Dubai subcontract rate per m², supply and apply
41
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 29 October 2026Ask QuantaFloor tiling, labour only
Fixing porcelain or ceramic floor tiles up to 60×60 cm with adhesive, grouting included, tiles and materials by others; Dubai subcontract rate per m², labour only
55
Estimate, not yet confirmed
AED / m²
No VATLabourChecked 27 October 2026Ask QuantaInternal emulsion paint system
Internal walls and ceilings: one coat sealer, two coats putty and two coats emulsion (Jotun or National Paints); Dubai subcontract rate per m², supply and apply
21.50
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 27 October 2026Ask QuantaExternal paint system
External walls: alkali-resistant primer and two coats exterior acrylic emulsion (Jotun or National Paints), scaffolding excluded; Dubai subcontract rate per m², supply and apply
23
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 27 October 2026Ask QuantaGypsum board false ceiling
Suspended gypsum board ceiling 12.5 mm on galvanised MF frame, joints taped and finished ready for paint; Dubai subcontract rate per m², supply and install
97.50
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 27 October 2026Ask QuantaTorch-applied membrane waterproofing
Torch-applied SBS-modified bitumen membrane 4 mm, one layer on primer, laps sealed, upstands included; Dubai subcontract rate per m², supply and apply
60
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 27 October 2026Ask QuantaSand–cement floor screed
Sand–cement floor screed 50–75 mm, levelled to receive floor finishes; Dubai subcontract rate per m², supply and apply
40
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 31 October 2026Ask QuantaMineral fibre tile ceiling 60×60 cm
Suspended mineral fibre tile ceiling 600×600 mm on exposed 24 mm T-grid, edge trims included; Dubai subcontract rate per m², supply and install
Light fittings, diffusers and access panels excluded.
75
AED / m²
VAT not statedSupply and installChecked 26 October 2026Ask QuantaAnti-termite soil treatment
Pre-construction anti-termite treatment of soil under slabs and foundations with an approved termiticide, warranty certificate included; Dubai subcontract rate per m², supply and apply
Large footprints price at the low end; small plots cost more per m².
10
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 26 October 2026Ask QuantaWall tiling, labour only
Fixing ceramic or porcelain wall tiles with adhesive, grouting and trims included, tiles and materials by others; Dubai subcontract rate per m², labour only
Residential and small-commercial contractor guide, not a large-project subcontract rate. Mosaic and small formats cost more.
70
Estimate, not yet confirmed
AED / m²
VAT not statedLabourChecked 26 October 2026Ask QuantaLarge-format tiling, labour only
Fixing large-format porcelain tiles 60×120 cm and larger with adhesive and levelling clips, tiles and materials by others; Dubai subcontract rate per m², labour only
Residential and small-commercial contractor guide, not a large-project subcontract rate.
78
AED / m²
VAT not statedLabourChecked 26 October 2026Ask QuantaMarble and granite flooring, labour only
Laying 2 cm marble or granite floor tiles or slabs in mortar or adhesive, stone and materials by others; Dubai subcontract rate per m², labour only
Residential and small-commercial contractor guide, not a large-project subcontract rate. Polishing not included.
160
AED / m²
VAT not statedLabourChecked 26 October 2026Ask QuantaEpoxy flooring, supply and apply
Epoxy floor coating system on prepared concrete, primer and two coats, about 300–500 microns; Dubai subcontract rate per m², supply and apply
Solid colour coating; self-levelling, flake or metallic systems cost more.
45
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 26 October 2026Ask QuantaInterlock paving, supply and lay
Interlocking concrete pavers 60–80 mm on compacted sand bed, joints sanded, kerbs excluded; Dubai subcontract rate per m², supply and lay
Kerbs and road base excluded; coloured 80 mm pavers cost more.
75
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 26 October 2026Ask QuantaDrywall partition
Drywall partition: 70 mm metal studs with one layer of 12.5 mm gypsum board each side, joints finished, insulation excluded; Dubai subcontract rate per m², supply and install
Single board each side; insulation, double boarding and painting add cost.
130
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 26 October 2026Ask QuantaCementitious waterproofing
Two coats of polymer-modified cementitious waterproofing to wet areas, balconies or tanks; Dubai subcontract rate per m², supply and apply
Tanks and detailing-heavy areas cost more.
40
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 26 October 2026Ask QuantaLighting point wiring
Lighting point: PVC conduit, 1.5 mm² wires from the board, back box and switch, light fitting excluded; Dubai subcontract rate per point, supply and install
Residential and small-commercial contractor guide, not a large-project subcontract rate.
250
Estimate, not yet confirmed
AED / point
VAT not statedSupply and installChecked 26 October 2026Ask Quanta13 A socket outlet point
Socket point: PVC conduit, 2.5 mm² wires from the board, back box and 13 A switched socket; Dubai subcontract rate per point, supply and install
Residential and small-commercial contractor guide, not a large-project subcontract rate.
200
Estimate, not yet confirmed
AED / point
VAT not statedSupply and installChecked 26 October 2026Ask QuantaSplit AC installation
Installing a wall split AC up to 2 TR with up to 3 m copper piping, insulation, drain pipe and outdoor bracket; unit supplied by others; Dubai rate per unit
Extra piping about AED 50–100 per metre beyond the standard length.
700
AED / unit
VAT not statedSupply and installChecked 26 October 2026Ask QuantaFoundation formwork
Formwork to sides of footings, raft edges and grade beams, fixing and striking; Dubai subcontract rate per m², labour and formwork materials
61.50
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 31 October 2026Ask QuantaBlockwork 100 mm, supply and build
100 mm hollow concrete blockwork in cement mortar, blocks and mortar included; UAE subcontract rate per m², supply and build
Solid 100 mm block costs about AED 11.5 more per m².
57.50
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 31 October 2026Ask QuantaDemolition of reinforced concrete
Breaking out reinforced concrete with hydraulic breakers, loading and disposal off site included; Dubai subcontract rate per m³
95
Estimate, not yet confirmed
AED / m³
VAT not statedSupply and installChecked 31 October 2026Ask QuantaGypsum plaster to walls
Single-coat gypsum plaster to internal blockwork walls, ready for paint; UAE subcontract rate per m², supply and apply
37
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 31 October 2026Ask QuantaEnamel paint to metal or timber
Alkyd enamel to new steelwork: one primer and two finishing coats; UAE subcontract rate per m², supply and apply
46
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 31 October 2026Ask QuantaPre-insulated panel ductwork
Pre-insulated panel ductwork, small ducts up to 400 mm, fabricated and installed with supports; UAE subcontract rate per m², supply and install
Ducts of 400–800 mm cost about AED 181 per m².
135
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 31 October 2026Ask QuantaSite hoarding 2.4 m
Temporary site hoarding 2.4 m high, GI sheet on steel frame; UAE subcontract rate per linear m, supply and erect
Converted from a rate per m² of hoarding face at 2.4 m height.
509
Estimate, not yet confirmed
AED / linear m
VAT not statedSupply and installChecked 31 October 2026Ask QuantaRemoving asphalt paving by mechanical breaker, including cart away
Asphalt pavement, priced per m³ of asphalt (source unit) — Breaking and cart away
33.50
Estimate, not yet confirmed
AED / m³
VAT not statedSupply and installChecked 27 October 2026Ask QuantaBreaking out concrete paving
Concrete pavement, per m²; thickness not stated — Breaking out; cart away not stated
42
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 27 October 2026Ask QuantaDemolition of concrete structure (incl. footings)
Demolition of concrete structure, general; the source does not split footings — Demolition; cart away not stated
95
Estimate, not yet confirmed
AED / m³
VAT not statedSupply and installChecked 27 October 2026Ask QuantaBreaking out mass concrete by hand tools, including cart away
Mass (plain) concrete, hand tools — Breaking out and cart away
125
Estimate, not yet confirmed
AED / m³
VAT not statedSupply and installChecked 27 October 2026Ask QuantaBreaking out RC slab
Demolition of reinforced concrete slab — Breaking out; cart away not stated
117
Estimate, not yet confirmed
AED / m³
VAT not statedSupply and installChecked 27 October 2026Ask QuantaDisposal of concrete and rubble off site, 30 m³ container, per trip
30 m³ roll-on roll-off container for concrete and rubble; about 92 AED per m³ of container — Container hire, haulage and disposal; loading not stated
2,760
Estimate, not yet confirmed
AED / trip
VAT not statedSupply and installChecked 27 October 2026Ask QuantaDisposal of concrete and rubble off site, 20 m³ container, per trip
20 m³ skip for concrete and rubble; about 94 AED per m³ of container — Container hire, haulage and disposal; loading not stated
1,870
Estimate, not yet confirmed
AED / trip
VAT not statedSupply and installChecked 27 October 2026Ask QuantaDismantling existing steel structure
Dismantling of steel structure, per ton of steel — Dismantling; cart away and scrap credit not stated
1,450
Estimate, not yet confirmed
AED / ton
VAT not statedLabourChecked 27 October 2026Ask QuantaMachine excavation in normal soil
Up to about 3 m deep — Labour and plant; disposal and backfill excluded
26.50
Estimate, not yet confirmed
AED / m³
VAT not statedLabourChecked 27 October 2026Ask QuantaRoof sandwich panel, install only, including flashings and trims
Installation labour and plant for roof sandwich panels, any core — Installation including flashings and trims as named; panels by others
74
Estimate, not yet confirmed
AED / m²
VAT not statedLabourChecked 27 October 2026Ask QuantaRoof sandwich panel, supply and install, including flashings and trims
Roof sandwich panel system, core and thickness not stated by the source — Panels, flashings, trims and installation
196
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 27 October 2026Ask QuantaStructural steel, fabricate and erect, hot-dip galvanised, simple connections
Hot-rolled structural steel frame, all section weights (no light/medium/heavy split in the source), Dubai/UAE subcontract rate — Supply, fabrication, finish as named and erection; bolts and fixings assumed per source wording; finish paint beyond the named system not included
8,610
Estimate, not yet confirmed
AED / ton
VAT not statedSupply and installChecked 27 October 2026Ask QuantaStructural steel, fabricate and erect, intumescent painted, simple connections
Hot-rolled structural steel frame, all section weights (no light/medium/heavy split in the source), Dubai/UAE subcontract rate — Supply, fabrication, finish as named and erection; bolts and fixings assumed per source wording; finish paint beyond the named system not included
9,470
Estimate, not yet confirmed
AED / ton
VAT not statedSupply and installChecked 27 October 2026Ask QuantaStructural steel, fabricate and erect, shop primed, moment connections
Hot-rolled structural steel frame, all section weights (no light/medium/heavy split in the source), Dubai/UAE subcontract rate — Supply, fabrication, finish as named and erection; bolts and fixings assumed per source wording; finish paint beyond the named system not included
8,390
Estimate, not yet confirmed
AED / ton
VAT not statedSupply and installChecked 27 October 2026Ask QuantaStructural steel, fabricate and erect, shop primed, simple connections
Hot-rolled structural steel frame, all section weights (no light/medium/heavy split in the source), Dubai/UAE subcontract rate — Supply, fabrication, finish as named and erection; bolts and fixings assumed per source wording; finish paint beyond the named system not included
6,790
Estimate, not yet confirmed
AED / ton
VAT not statedSupply and installChecked 27 October 2026Ask QuantaSteel structure for hangar, 25–40 m clear span, per m² covered area
Portal or truss frame, high eaves (10–13 m), clear span 25–40 m — Main steel frame supplied, fabricated, shop primed and erected; cladding, purlins/girts if cold-formed, doors, foundations and finish paint excluded
378
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 27 October 2026Ask QuantaSteel structure for hangar or aircraft shelter, 60–80 m clear span, per m² covered area
Long-span truss roof on columns, clear span 60–80 m — Main steel frame supplied, fabricated, shop primed and erected; cladding, purlins/girts if cold-formed, doors, foundations and finish paint excluded
805
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 27 October 2026Ask QuantaSteel structure for warehouse, per m² covered area
Portal frame, low eaves (6–8 m), large span about 25–40 m — Main steel frame supplied, fabricated, shop primed and erected; cladding, purlins/girts if cold-formed, doors, foundations and finish paint excluded
294
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 27 October 2026Ask QuantaUnderground RC pump-room shell, per m² floor area
Internal 8×4×4 m (32 m²); walls 300 mm, base 400 mm, roof 250 mm, C35/45, rebar 110 kg per m³ of concrete — Excavation, blinding, RC shell with formwork and rebar, external waterproofing, backfill. Excludes access stair, hatches, ventilation, finishes, MEP and pumps
Partial build-up: excludes formwork, dewatering, roof framing, ladders, vents and internal pipework.
3,626
Estimate, not yet confirmed
AED / m²
VAT not statedSupply and installChecked 27 October 2026Ask QuantaUnderground RC water or fire-water tank, about 1000 m³, per m³ net capacity
Internal 18×11.5×5.5 m (0.5 m freeboard, net 1035 m³); walls 450 mm, base 550 mm, roof 300 mm, C35/45, rebar 110 kg per m³ of concrete
Partial build-up: excludes formwork, dewatering, roof framing, ladders, vents and internal pipework.
639
Estimate, not yet confirmed
AED / m³
VAT not statedSupply and installChecked 27 October 2026Ask QuantaUnderground RC water or fire-water tank, about 100 m³, per m³ net capacity
Internal 6×5×4 m (0.5 m freeboard, net 105 m³); walls 350 mm, base 450 mm, roof 250 mm, C35/45, rebar 110 kg per m³ of concrete — Excavation 3–6 m with cart away, blinding (material), RC base, walls and roof with formwork and rebar, external membrane waterproofing, internal cementitious coating, backfill with imported sand. Excludes dewatering, shoring, ladders, vents, manholes, pipework, testing
Partial build-up: excludes formwork, dewatering, roof framing, ladders, vents and internal pipework.
1,235
Estimate, not yet confirmed
AED / m³
VAT not statedSupply and installChecked 27 October 2026Ask QuantaUnderground RC water or fire-water tank, about 250 m³, per m³ net capacity
Internal 10×7×4 m (0.5 m freeboard, net 245 m³); walls 350 mm, base 450 mm, roof 250 mm, C35/45, rebar 110 kg per m³ of concrete — Excavation 3–6 m with cart away, blinding (material), RC base, walls and roof with formwork and rebar, external membrane waterproofing, internal cementitious coating, backfill with imported sand. Excludes dewatering, shoring, ladders, vents, manholes, pipework, testing
Partial build-up: excludes formwork, dewatering, roof framing, ladders, vents and internal pipework.
920
Estimate, not yet confirmed
AED / m³
VAT not statedSupply and installChecked 27 October 2026Ask QuantaUnderground RC water or fire-water tank, about 500 m³, per m³ net capacity
Internal 12×9×5 m (0.5 m freeboard, net 486 m³); walls 400 mm, base 500 mm, roof 300 mm, C35/45, rebar 110 kg per m³ of concrete — Excavation 3–6 m with cart away, blinding (material), RC base, walls and roof with formwork and rebar, external membrane waterproofing, internal cementitious coating, backfill with imported sand. Excludes dewatering, shoring, ladders, vents, manholes, pipework, testing
Partial build-up: excludes formwork, dewatering, roof framing, ladders, vents and internal pipework.
767
Estimate, not yet confirmed
AED / m³
VAT not statedSupply and installChecked 27 October 2026Ask QuantaUnderground RC water or fire-water tank, about 750 m³, per m³ net capacity
Internal 15×10×5.5 m (0.5 m freeboard, net 750 m³); walls 450 mm, base 550 mm, roof 300 mm, C35/45, rebar 110 kg per m³ of concrete
Partial build-up: excludes formwork, dewatering, roof framing, ladders, vents and internal pipework.
701
Estimate, not yet confirmed
AED / m³
VAT not statedSupply and installChecked 27 October 2026Ask Quanta
Dollar prices at 3.67 AED per US dollar
The QS Mind weekly
One email every Sunday: the week's biggest building-material price moves in Egypt, Saudi Arabia and the UAE, and what is new at QS Mind.
About “market price on its date”
Every price here is a market price on its check date, with the conditions it holds for. The price on your order changes with quantity, supplier, payment terms and delivery point.
Need the price of your own item?
This page shows common items. Quanta prices any item to your specification, quantity and site, with its conditions.